📈Last 7 days+81 installs — 16% slower than the week before (+96) · 9/day since Oct 7
🏆Among Tools appstop 11% by installs gained this week (310 peers growing)
🛠Updatesactively updated · updated 19 days ago · every ~295 days (2 updates tracked)
Installs since launch
+275 installs
since Oct 7
Update history
1.3.7Oct 27, 2026 · seen Nov 5, 2026
• Compatível com o Android 16.<br>• Corrigido o login e a troca de senha do Wi-Fi com senhas que têm alguns caracteres especiais.<br>• O app não fica mais parado na tela de abertura quando as notificações falham.<br>• Outras correções e melhorias.
1.3.6Jan 5, 2026 · seen Oct 16, 2026
Adicionado download do arquivo do boleto
PowerApp is a tools app by Power Telecom Ltda with 5,000+ downloads (about 7K estimated). +81 installs in the last 7 days. Install growth, rank history, SDKs and ad networks.
From the store listing: “APP for Power Telecom customer use”